top of page

3

STEP 3 SQUARES: Add Fill 

Next, remove turf squares and add 1" to 1-1/4" of additional Paver Base material (half of 50# bag for 20" paver pictured or about (5-6) 12" squares per 50# bag) in the spaces to raise the finished turf pile height.  (Ideally turf to be +/-1" higher than the paver) You can substitute this step with SubTurf Foam Squares. 

IMG-2644.jpg

Place SubTurf Foam Square in place, if applicable

IMG-2651.jpg

Spread evenly by hand or tool 

IMG-2645.jpg

Lightly spray with water, if available, and lightly compact with a hand tamper being careful not to crack any paver edges. 

Approximate: (1) 50# Bag Paver Base to every (2) 20" x 20" Turf Squares 

IMG-2643.jpg
bottom of page