top of page

2

STEP 2 KIT A+: Assemble SUBTURF Foam Grid

Once you have a completed and prepared sub base you are ready for SubTurf assembly. Pay close attention to ALL male/female connection points and locations. You will need to match this drawing exactly. There are (3) different SUB-TURF size strips represented in the different colors. All (3) of the Orange strips are identical along with all (12) of the yellow strips. The (8) Green strips are not all the same and must be installed exactly per below diagram. Place appropriate connector on top of corresponding opening and gently push down into place keeping all lines straight and square. 

3d model  2.PNG

Finished assembly should like the image below and you are ready for paver placement!

Subturf10_edited.jpg
bottom of page